You don't have javascript enabled. Good luck with that.
Pencarian
Sudin SDA mulai Rapihkan Longsoran Turap
.
photo Wuri Setyaningsih - Beritajakarta.id

Damaged Sheet Pile on Jalan Jati Padang Repaired

South Jakarta Water Resources Sub-dept. is repairing a damaged sheet pile on Jalan Jati Padang Poncol, RT 06/08, Jati Padang, Pasar Minggu, which was eroded last Wednesday.

We send one excavator to clean up the chunks of erosion at the location

Based on the field report, sheet pile repair involves 20 freelancers of South Jakarta Water Resources Sub-dept. assisted by 30 PPSU officers.

Damaged Sheet Piles in Ciliwung will Be Repaired

South Jakarta Water Resources Sub-dept. Hili Susanto disclosed, sheet pile has 30 meters length and 3 meters height.

"We send one excavator to clean up the chunks of erosion at the location," he stated, Friday (4/14). 

He went on the say that it should be repaired in order to anticipate inundation.

"And then continued with repair using terracing method like soil in the rice fields area," he stated.

Linked News
Popular News indeks
  1. Most Residents Satisfied with Pramono-Rano's Performance

    access_time25-06-2025 remove_red_eye314 personDessy Suciati
  2. Pramono Ensures KJP will Continue to Be Distributed

    access_time26-06-2025 remove_red_eye311 personDessy Suciati
  3. No Car Free Day on June 29 to Support Jakarta International Marathon 2025

    access_time24-06-2025 remove_red_eye294 personAldi Geri Lumban Tobing
  4. 19,675 People Visit Ragunan Zoo on Islamic New Year

    access_time27-06-2025 remove_red_eye286 personTiyo Surya Sakti
  5. Transjakarta Wins Award for Best GCG Company

    access_time27-06-2025 remove_red_eye271 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik